Renovation Pre-Start Checklist
Before the hammer strikes. Logistics and protection steps to take before contractors walk through your door.
By Dan Gold · Sources reviewed

Prepare a written plan for scope, money, permits, dust and household access. Pay special attention to older paint and suspected asbestos before any disturbance; ordinary plastic sheeting alone is not a hazardous-material plan.
Work through the checklist
- Contract: Agree scope, exclusions, materials, milestones, change orders, payment schedule and completion/cleanup obligations in writing.
- Credentials: Verify required licensing with the issuing authority and insurance with the appropriate provider, not just a logo on a quote.
- Permits: Ask the local authority what is required and assign responsibility for permits and staged inspections.
- Materials: Verify exact models, dimensions, quantities and realistic delivery/storage dates before dependent work starts.
- Worker access: Agree parking, toilets, water, work hours, authorized access and pet/child separation.
- Surface protection: Use suitable floor/path protection that will not damage finishes or block exits.
- Containment: Have the contractor plan dust control, ventilation and HVAC isolation. Do not casually block returns while running the system.
- Hazard assessment: For pre-1978 paint or suspected asbestos, arrange appropriate assessment and trained work practices before demolition.
- Belongings: Move valuables and sensitive items away from the work zone and photograph pre-work condition.
- Communication: Choose a contact, update schedule and written change-approval process; tell neighbors about expected disruption.
- Payment and acceptance: Check state rules on deposits, understand lien/receipt procedures and tie payments to agreed verified work rather than blanket percentages.
Progress is saved in this browser. Revised tasks start a new checklist.
Check the result and follow up
Hold a pre-start meeting and save the approved documents. Confirm emergency access, containment and material readiness before workers begin. Record changed scope before authorizing it, inspect at the agreed milestones and keep a final defect/cleanup list. Neither a fixed twenty-percent contingency nor a key lockbox guarantees a trouble-free project.
Sources and scope
- FTC: hiring a home-improvement contractor
- EPA: lead-safe renovation
- EPA: indoor air quality during remodeling
These references support the guidance above. Source review is not a hands-on test of your home or a certification of a product. Follow the instructions for your exact model and local requirements.
Did this help?
Get more simple guides like this in your inbox.
Related reads and checklists
Label Your Breaker Box
Map accessible branch circuits through normal breaker controls and record a clear directory without removing the panel cover.
BlogTake "Before" Photos
Take photos of every room and valuable item for insurance purposes.
ChecklistBathroom Remodel Planning
Plan the perfect sanctuary. A roadmap to navigating layouts, materials, and plumbing for a successful renovation.
ChecklistKitchen Remodel Planning
Design the heart of your home. Critical decisions for layout, cabinetry, and appliances to avoid costly changes later.